[Construction Case] Inzai City, Chiba Prefecture - Removal Work of Underground Continuous Walls at New Construction Site
Please leave the ground improvement work and ground surveys to us! An example of underground continuous wall removal.
We would like to introduce a case of underground obstacle removal that we conducted. This was carried out at a new construction site in Inzai City, Chiba Prefecture. Using the SR-45 multi-drill drilling machine, we performed the removal of a cement milk and H-steel underground continuous wall using the multi-drill method. For more details about the case, please check the related link. 【Case Overview】 ■ Project Name: Underground Continuous Wall Removal at New Construction Site in Inzai City, Chiba Prefecture ■ Construction Date: February 8, 2020 ■ Location: Inzai City, Chiba Prefecture ■ Details: Core material H400×200, GL-16.0m *For more information, please download the PDF from the related link or contact us.